Technical procurement and supplier-response guide

What Information Should Be Included in a Terminal Block RFQ?

A reliable RFQ defines the installed circuit and complete approved terminal configuration—not just amps, volts and quantity. Give every supplier the same technical, evidence, quality, change-control and delivery inputs, then require a part-number-specific response with every exception visible.

Application before catalogFunction, circuit role, conductors and environment decide which product evidence is relevant.
Configuration includes accessoriesJumpers, end plates, markers, covers, rails and fuse parts belong in the controlled BOM.
Evidence needs a locatorAsk for the exact document, revision, page, file or combination condition behind each response.
Silence is not complianceEvery line returns Confirmed, Exception, Alternative proposed or Not applicable.

Background: a technician identifies and tags control wires inside switchgear. Photo: MTA Capital Construction Mega Projects / Wikimedia Commons, CC BY 2.0. Background cropped and darkened for layout. The scene does not identify a SENTOP product or prove terminal type, ratings, certification, installation compliance or safe working state.

Answer first

Describe one installed application and demand one traceable offer

An RFQ becomes comparable only when the buyer's requirements and the supplier's exceptions stay visible line by line.

01 / Application

Function and circuit role

State whether each position is feed-through, PE, disconnect/test, fuse, distribution, pluggable, signal or another defined function, and identify feeder, branch, control or field-wiring context.

02 / Configuration

Exact terminal row

Define complete part numbers, poles, levels, potentials, colors, jumpers, end plates, markers, rail hardware, covers and the approved-alternate rule.

03 / Evidence

Ratings under stated conditions

Request the approval-specific data sheet, drawing, certification record, Conditions of Acceptability, test condition or declaration for the exact offered item.

04 / Supply

Acceptance and commercial basis

Define sample or FAI needs, traceability, PCN/PDN, quantities, MOQ, pack multiple, price basis, lead-time definition, packaging and Incoterms rule with named place.

Responsibility boundary: a supplier quotation does not approve the electrical design, certify a panel or authorize a substitute. The responsible design, panel or end-product process must review the offered model and all conditions before release.
Four documents—four different decisions

An RFQ is not a catalog search, approval submittal or purchase order

Keep the buying sequence auditable so an early product suggestion is never mistaken for an approved release.

01 / SEARCH

Catalog shortlist

Identifies possible families and connection technologies using preliminary application data.

Not proof of suitability, certification scope or substitute approval.
02 / RFQ

Comparable supplier response

Freezes buyer requirements, response fields, evidence targets, quantities, assumptions and the exception process.

Produces a technically and commercially reviewable offer.
03 / SUBMITTAL

Technical approval record

Checks exact parts, accessories, drawings, ratings, evidence and deviations against the responsible project design.

Approval belongs to the named authority, not supplier silence.
04 / ORDER

Released supply commitment

Authorizes the approved parts, revisions, quantities, prices, delivery, documentation, packaging and change-control clauses.

The PO must preserve accepted deviations and evidence references.

Start with the available terminal block product families, but use the RFQ and approval record—not visual similarity—to control the final offer.

Control the complete terminal row

The base block is only one line of the BOM

Describe what every position must do and attach a current terminal plan or sequence drawing. Include poles, levels, potentials, conductor entries, colors, keying, numbering, marker text and language. If a jumper topology is required, show the intended locations and request the exact bridge or comb—not a supplier assumption.

Itemize end plates, end stops, separators, covers, test plugs, fuse carriers or links, marker carriers and mounting rail hardware. Compatibility can be series-specific, and an accessory can change current, voltage, spacing, touch-protection or approval conditions. Ask the supplier to identify those effects in writing.

Use the same scope discipline for control cabinet wiring components and terminal block accessories. A rail fit and a similar nominal current do not make two assemblies interchangeable.

Controlled configuration rule: exact manufacturer + family + full order code + part revision where controlled + each accessory MPN + terminal plan revision + quantity + approved-alternate status.

State “No substitution, including accessory, label, material or manufacturing-location substitution, without written approval.” If alternates are permitted, define the required comparison rather than using the single word “equivalent.”

DIN-rail terminal blocks with matching jumper accessories arranged beside them
Terminal and jumper compatibility is series-specific. Photo: Zimin.V.G. / Wikimedia Commons, CC BY-SA 4.0. Displayed complete and scaled only; source content is unchanged. This third-party WAGO example is not a SENTOP product and proves no substitution, rating, spacing or certification.
Terminal block RFQ checklist

The 10 details every comparable quote needs

Each item needs a buyer input, a supplier response and an evidence locator. “Per data sheet” is not a complete answer when multiple approvals or configurations exist.

01 / RFQ CONTROL

Identity and revision

RFQ ID, issue/revision, project, destination market, deadline, contacts, confidentiality, currency and quote validity.

Supplier: quote revision, assumptions and signed exception log.
02 / CIRCUIT ROLE

Installed function

Feeder, branch, control, signal, neutral, protective-conductor, fuse, disconnect/test or another defined path; field or internal wiring.

Supplier: intended-use confirmation and every limitation.
03 / PRODUCT ID

Complete configuration

Function, manufacturer preference, full MPN, poles, levels, potentials, colors, terminal sequence and approved alternate rule.

Supplier: exact offered MPN/revision and alternate comparison.
04 / CONDUCTORS

Every termination condition

Cu/Al only where permitted, solid/stranded/fine-stranded, AWG/mm², ferrule, temperature class and conductors per clamp.

Supplier: approval-specific ranges and restrictions.
05 / ELECTRICAL

Actual AC/DC duty

Nominal and maximum working voltage, frequency, continuous current, load profile, grouping and ambient assumptions.

Supplier: ratings, derating and bridge/accessory limits.
06 / INSULATION & FAULT

Project study context

Ui/Uimp context, OVC, pollution degree, altitude and insulation function where applicable; AFC and upstream OCPD when SCCR matters.

Supplier: evaluated conditions and exact combination evidence.
07 / MOUNTING & ENVIRONMENT

Fit and external influences

Rail, orientation, row length, depth, wire access, CAD, ambient/storage, condensation, vibration, dust, corrosion and sector needs.

Supplier: dimensions, limits and approval exceptions.
08 / COMPLIANCE & DOCUMENTS

Exact market evidence

Destination countries and specific UL/CSA/IEC/CB/EU or customer evidence requested; drawing, instruction and declaration revisions.

Supplier: status, file/report/document IDs, scope and applicable Conditions of Acceptability (CofA).
09 / QUALITY & CHANGE

Acceptance and traceability

Sample/first-article inspection (FAI)/factory acceptance test (FAT) applicability, inspection plan, Certificate of Conformance (CoC)/Certificate of Analysis (CoA) content, lot/date code, PCN/PDN and nonconformance disposition.

Supplier: actual capability, policy and report templates.
10 / COMMERCIAL & LOGISTICS

Total supply assumptions

Prototype/pilot/production quantities, forecast, dates, packaging, labels, origin/customs and Incoterms rule with named place.

Supplier: MOQ, pack multiple, prices, lead-time basis and delivery terms.
Technical response matrix

Separate buyer input, supplier response and evidence locator

Do not ask a supplier to design an unspecified circuit. Provide the operating conditions and let the supplier identify exactly what its offered product supports.

Read terminal block specifications
RFQ groupBuyer statesSupplier returnsEvidence
Function & circuitTerminal function, circuit role, field/internal wiring, poles/levels, potentials and connection count.Exact product function, intended use, category and limitations.Current data sheet, drawing and certification record.
ElectricalAC/DC, voltage, frequency, continuous current and duty, load/inrush where relevant, ambient/grouping assumptions.Approval-specific ratings, bridge limits, derating and required protection.Rating table and document page for the exact model.
ConductorsMaterial, class, range, ferrule/preparation, conductors per clamp and temperature class.Permitted conductor combinations, field/factory conditions, strip/tool and torque requirements.Connection table and installation instructions.
InsulationWorking-voltage system and required Ui/Uimp, OVC, pollution degree, altitude or insulation function where applicable.Evaluated values and the conditions to which they apply.Applicable standard/certificate/report and product table.
Fault dutyCircuit location, AFC context, target panel requirement and known upstream protective device.Exact SCCR or protected-combination basis and every voltage/OCPD/conductor limit.Product marking, controlled default or named combination record as permitted.
MechanicalRail profile, orientation, row length, enclosure depth, wire direction, service access and CAD format.Dimensions, rail and end-stop compatibility, clearances and layout limitations.Dimensioned drawing, STEP/CAD and assembly list.
EnvironmentOperating/storage/transport conditions, condensation, vibration, dust, chemicals, corrosion and sector constraints.Evaluated limits, special approvals and exceptions.Product/environmental data and approval report.

Use the dedicated pages for seven essential terminal block specifications, current rating versus actual load and creepage and clearance inputs. The RFQ records the project requirement; it does not replace those engineering checks.

Insulated and uninsulated wire ferrules beside a crimping tool
Conductor preparation belongs in the quotation basis. Photo: Simon A. Eugster / Wikimedia Commons, CC BY-SA 3.0. Displayed complete and scaled only; source content is unchanged. Ferrule colors are not a universal size proof, and the photo does not establish that any terminal accepts a ferrule.
Conductor and termination data

“Accepts 2.5 mm²” is not a complete connection specification

List conductor material and construction at each clamping point: copper or aluminum only where the product permits it; solid, stranded or fine-stranded; bare or ferruled; the project AWG and/or mm² range; temperature class where relevant; and whether one or two conductors are required in one opening. Do not infer one approval system's range from another.

State the required connection technology—screw, spring, push-in, bolt, plug or another evaluated method—and request the exact strip length, tightening torque where applicable, tool and conductor-preparation instructions. Never copy a torque, strip length or ferrule rule from a similar family.

Keep field wiring and internal wiring separate. Certification conditions, conductor class, size and temperature rating can differ. If a ferrule is planned, name the ferrule construction and ask the supplier to confirm the evaluated conductor/ferrule combination and tooling.

Buyer field: terminal designation → conductor material/class → range → preparation → count per clamp → field/internal wiring → temperature class → required connection technology.

Use the guides for AWG wire sizing, when ferrules are required and torque specifications for the underlying technical review.

Electrical, insulation and short-circuit context

Keep normal duty, insulation and fault claims separate

State AC or DC, nominal and maximum working voltage, frequency where relevant, continuous current and duty/load profile. Add ambient, grouping and bridge assumptions that may change the applicable current. Ui, Uimp, working voltage, current and SCCR are different fields; do not combine them in one “rating required” cell.

If insulation coordination matters, identify the project-defined overvoltage category, pollution degree, altitude and insulation function under the governing equipment route. Do not ask a supplier for one universal creepage or clearance number without the relevant system and standard conditions.

If SCCR is relevant, state the circuit role, available-fault-current context and known upstream OCPD. Require the exact terminal part number, rated voltage, conductor conditions, protective-device manufacturer, class/type, catalog number, maximum ampere rating and every condition behind a claimed combination.

10 kA boundary: the public UL 508A Table SB4.1 value is a controlled panel-analysis fallback when the exact component SCCR is not marked or otherwise established and the active method permits its use. It is not a universal UL 1059 marking, cannot override a lower documented rating and does not by itself establish panel SCCR.

Review terminal block SCCR for UL 508A panels and high-current terminal blocks before freezing the fault-duty or continuous-current line.

Two different DIN-rail power terminal geometries photographed side by side
Appearance does not establish the electrical evidence route. Photo: Dmitry G / Wikimedia Commons, CC BY-SA 3.0. Displayed complete and scaled only; source content is unchanged. The image proves no current, voltage, conductor, Al/Cu, SCCR, field-wiring or certification capability.
Market and evidence routes

Ask for exact status—not “UL/IEC/CE approved”

Certification, declaration, environmental communication and completed-equipment approval answer different questions.

01 / NORTH AMERICA

UL 1059 or UL 1953 context

Request the exact model, UL status, applicable route, CCN/file, ratings, field/factory-wiring suitability and, for a Recognized Component, applicable Conditions of Acceptability (CofA). A UL 1059 Recognized terminal block and a UL 1953 Listed power distribution block are not interchangeable labels.

02 / IEC FUNCTION

Use the correct IEC 60947-7 part

IEC 60947-7-1 covers terminals and test-disconnect terminals within its scope; -7-2 covers protective-conductor terminal blocks; -7-3 covers applicable fuse terminal blocks. Ask for function-specific evidence, not “IEC terminal.”

03 / EU MARKET

CE only where legislation applies

When the offered supply and its market role fall under applicable EU legislation, request the relevant EU Declaration of Conformity and exact product/document identity. A generic “CE certificate” is not the default evidence request for every terminal.

04 / MATERIAL DATA

RoHS, REACH/SVHC and customer lists

Request current, part-number-specific and dated declarations or communications as applicable. These are separate evidence routes; a portfolio statement or one checkbox does not cover every market or substance requirement.

Abbreviation control: use CofA for UL Conditions of Acceptability and CoA for Certificate of Analysis. Spell both out the first time in the RFQ so an approval condition is never confused with a test-results certificate.

Use the dedicated guides for terminal block certification standards worldwide, avoiding certification errors and interpreting terminal block markings.

Open automated-equipment control panel with DIN-rail devices and wired terminal rows
The quote must fit the complete panel context. Photo: Bridgeland Copyright / Wikimedia Commons, CC BY-SA 3.0. Displayed complete and scaled only; source content is unchanged. This third-party panel is context only and proves no design quality, SENTOP product use or UL/IEC compliance.
Request evidence, not marketing shorthand

A logo, family page or email assurance is not a submittal

For each critical response, ask which exact part number and revision the evidence covers; which standard, edition, category/file or issuing organization applies; which ratings and environmental conditions are stated; and whether the document covers every supplied accessory.

Request the current data sheet, dimensioned drawing, installation instructions, approval-specific rating table, Product iQ record or other certification identifier, applicable CofA, test or combination record, and dated environmental declarations. Require a document number, revision/date and page locator so production and quality teams can find the same proof later.

A QMS certificate such as ISO 9001 addresses the certified management-system scope and site. It does not prove the quoted terminal meets the buyer's product specification, inspection plan or complete panel requirements. Keep supplier qualification separate from product approval.

Evidence ladder: exact product identity → current controlled document → applicable rating or condition → configuration/accessory match → supplier exception → responsible buyer approval → purchase-order reference.

The RFQ should identify the intended panel builder and switchgear project context without asking the component supplier to approve the completed assembly.

Supplier response rule

Use four status choices that expose every gap

Freeze the buyer requirement column. The supplier completes a separate status, response, evidence and impact column without overwriting what was requested.

01 / CONFIRMED

Requirement met

Supplier identifies the exact offered part/configuration and attaches or locates the current evidence supporting the response.

No evidence locator means the line is incomplete.
02 / EXCEPTION

Requirement not met as written

Supplier explains the technical, certification, quality, schedule and commercial impact and proposes a disposition.

Do not hide an exception in quotation notes.
03 / ALTERNATIVE

Different solution proposed

Supplier gives an exact alternative MPN and a line-by-line comparison, including every accessory and evidence difference.

An alternative is not approved until written disposition.
04 / NOT APPLICABLE

Field does not apply

Supplier explains why the requirement is outside the quoted product, circuit, market or supply scope.

Blank cells and silence never mean N/A or compliance.
Nine-step quotation and release workflow

Freeze, quote, compare, approve and preserve

The response matrix keeps technical approval separate from commercial award while preserving a usable record for production and later changes.

01 / FREEZE

Issue one controlled RFQ

Align RFQ revision, BOM, terminal plan, drawings, quantities, market and open engineering questions.

02 / DEFINE

State the installed application

Give function, circuit, conductors, electrical/fault context, mounting, environment and required evidence.

03 / ITEMIZE

List the complete terminal set

Include exact base blocks, bridges, end pieces, markers, rail hardware, covers and project-specific parts.

04 / RESPOND

Return status per line

Supplier uses Confirmed, Exception, Alternative or Not applicable with evidence and impact.

05 / NORMALIZE

Resolve commercial definitions

Separate MOQ from pack multiple and define price, lead-time, packaging, origin and delivery assumptions.

06 / REVIEW

Verify evidence and conditions

Match part/revision, approval route, ratings, documents, accessory configuration and stated limitations.

07 / DISPOSE

Approve or reject exceptions

Record responsible technical, quality and commercial decisions before comparing the released offers.

08 / AWARD

Place the controlled order

Carry approved MPNs, deviations, quantities, documents, packaging, delivery and change clauses into the PO.

09 / PRESERVE

Link receipt to the decision file

Retain quote, evidence, approval, sample/inspection record, lot identity and later PCN/PDN disposition.

Buyer decision gate: if the supplier cannot identify the exact part, ratings/conditions, accessory configuration, approval evidence or delivery assumptions, mark the line technically unpriced rather than comparing it as a like-for-like offer.
Quality, acceptance and change control

Match the acceptance plan to what is actually supplied

For catalog components, define the sample or first-article configuration, inspection characteristics, acceptance criteria, lot identity and record format. A sample should represent the proposed model, accessories, labels, packaging and production site when those attributes matter.

Use a factory acceptance test only for a custom assembled or prewired terminal row when the RFQ defines the released drawing, witness/hold points, inspection and test methods, calibrated equipment, acceptance limits, nonconformance disposition and final report. FAT is not a routine default for every catalog block.

Define a Certificate of Conformance (CoC) by required content: PO, supplied MPN/revision, lot/date code, quantity, conformity basis and issuer. If a Certificate of Analysis (CoA) is needed, name the measurement/test, method, sample identity, acceptance limits and result fields.

Require Product Change Notification and Product Discontinuation Notification for the agreed scope: material, form/fit/function, site/process, approval status, markings, accessories, packaging, origin and discontinuation. State the contractual notice requirement or require the supplier to propose its actual policy; no one notice period is universal.

Safe-work boundary: inspection requirements in an RFQ are not live-work instructions. Any electrical inspection or test needs a controlled method, qualified personnel and the applicable deenergization, lockout/tagout and absence-of-voltage process. Do not open energized equipment to verify a quotation.
Technician identifying and testing control wires inside a power-substation enclosure
Acceptance deliverables must be defined before testing. Photo: MTA Capital Construction Mega Projects / Wikimedia Commons, CC BY 2.0. Displayed complete and scaled only; source content is unchanged. The image does not show circuit status and is not a live-work, LOTO, PPE or test-method instruction.
Commercial and logistics comparison

Normalize the quote before comparing unit price

The same price can conceal different pack multiples, lead-time triggers, origin, documentation and delivery obligations.

Review wholesale terminal block sourcing
Commercial fieldBuyer statesSupplier returns
Quantity & forecastPrototype, pilot and production quantity per MPN; annual forecast or release profile where available.MOQ, order/pack multiple, price breaks, capacity and allocation assumptions—shown separately.
Price & validityCurrency, line-level format, validity expectation and whether tooling/NRE is permitted.Unit price by quantity, tooling/NRE, surcharge, validity, tax/duty and currency basis.
Lead timeRequested ship/delivery date and whether stock, production, shipment or door-to-door time is required.Lead-time type, start trigger, calendar/business-day basis, manufacturing site and schedule risks.
Packaging & labelsPack quantity, anti-mix controls, barcode/label fields, damage protection and any project grouping.Pack format, label sample, handling limits and cost for special packaging.
Delivery & customsDelivery address, importer role, origin/HS-code need, freight responsibility and requested rule.Incoterms 2020 rule with precise named place, country of origin, HS code and delivery assumptions.

MOQ is not pack quantity: MOQ is the smallest order the supplier accepts; pack or order multiple is the unit in which the part must be ordered or shipped. Ask for both with units. Define “lead time” just as precisely.

Release hold points

Stop when one of these six gaps remains

A low price does not cure an unresolved application, evidence or delivery assumption.

STOP 01

The circuit and function are unclear

Resolve feeder/branch/control role, terminal function, conductors, voltage/current/fault context and responsible design input.

STOP 02

The terminal row is incomplete

Add every base block, bridge, end part, marker, cover, rail item and project-specific accessory to the controlled BOM.

STOP 03

The supplier did not identify an exact MPN

A family page, photograph, nominal size or “equivalent” note cannot be technically released.

STOP 04

The evidence does not match the offer

Resolve part/revision, certificate/file scope, rating conditions, accessories and document date/page before approval.

STOP 05

An exception has no disposition

Record acceptance, rejection or redesign by the named technical, quality and commercial owners.

STOP 06

Commercial terms are incomparable

Normalize MOQ, pack multiple, price breaks, validity, lead-time basis, origin, packaging and delivery responsibilities.

Copy into your RFQ cover sheet

Eight groups for a part-number-specific quotation

Send the files you have and label every unknown. SENTOP can help identify matching product families, accessories, document availability, MOQ and lead-time assumptions; the project authority controls design approval and compliance.

Send Your Terminal Block RFQ
01 / PROJECT

RFQ ID/revision, project, destination countries, panel/equipment role, deadlines, contacts, confidentiality, quote currency and validity.

02 / DRAWINGS

BOM, terminal plan, schematic/one-line context, panel layout, marker schedule, CAD/STEP need and all referenced document revisions.

03 / APPLICATION

Function and circuit role per position; AC/DC, voltage, frequency, current duty, insulation/fault context, environment and sector needs.

04 / CONDUCTORS

Material, construction, AWG/mm² range, ferrule/preparation, temperature class, count per clamp, field/internal wiring and connection technology.

05 / CONFIGURATION

Exact or preferred MPNs, poles/levels/potentials, colors, bridges, end parts, covers, rail hardware, fuse/test parts, markers and alternate policy.

06 / EVIDENCE

Requested certification status/files/CofA, data sheets, drawings, instructions, SCCR combinations, declarations, environmental data and page locators.

07 / QUALITY

Sample/FAI/FAT applicability, inspection and acceptance criteria, CoC/CoA fields, lot/date-code labels, nonconformance and PCN/PDN rules.

08 / COMMERCIAL

Quantity per MPN and phase, forecast, price-break format, MOQ/pack multiple, delivery target, lead-time definition, packaging, origin and Incoterms named place.

Related SENTOP engineering guides

Use each specialist page to complete the RFQ inputs

This page controls the quotation package. These resources own the underlying model, specification, approval and sourcing decisions.

Frequently asked questions

Terminal block RFQ FAQ

The same 10 questions and answers appear in the FAQPage data below. Apply the actual project standards, certification records and responsible design process.

What is the most important item in a terminal block RFQ?

The most important item is a controlled description of the installed application and complete configuration. Identify the terminal function, circuit role, conductors, electrical conditions, accessories, market approvals and evidence expected from the supplier. Current rating alone is not enough.

Is UL Recognized the same as UL Listed for a terminal block?

No. A UL Recognized Component is evaluated for use under defined Conditions of Acceptability in a larger end product. Request the exact status, standard, CCN, file number, ratings and CofA for the offered model. Certification of the component does not certify the completed panel or machine.

Which IEC 60947-7 standard should an RFQ specify?

Match the standard to the terminal function. IEC 60947-7-1 applies to the terminal blocks and test-disconnect terminal blocks within its scope, IEC 60947-7-2 covers protective-conductor terminal blocks, and IEC 60947-7-3 covers applicable fuse terminal blocks. Do not use “IEC terminal block” as a complete specification.

What conductor information should the RFQ include?

State conductor material, construction, minimum and maximum size, AWG and/or mm² requirement, ferrule or other preparation, conductor temperature class where relevant, and the number of conductors per clamping point. Keep field-wiring and internal-wiring conditions separate.

How should SCCR be requested for a terminal block?

State the circuit role, fault-current context and known upstream protective device. Require the exact terminal model, voltage, conductor conditions and OCPD manufacturer, type, catalogue number and maximum ampere rating behind the SCCR. Do not accept a bare kA value as proof of panel suitability.

Should terminal block accessories be included in the RFQ?

Yes. Itemize end plates, end stops, separators, jumpers, combs, covers, test plugs, fuse parts, marker carriers and rail hardware by exact part number and quantity. Ask the supplier to identify compatibility and any current, voltage, spacing or approval limitation introduced by an accessory.

Should an RFQ ask for a CE certificate?

Use more precise wording. CE marking is required only where applicable EU legislation requires it, and the manufacturer is responsible for the conformity assessment and EU Declaration of Conformity. Request the applicable declaration and product identification rather than a generic “CE certificate.”

What is the difference between CofA and CoA?

CofA means UL Conditions of Acceptability and describes limitations for using a Recognized Component in an end product. CoA commonly means Certificate of Analysis and contains specified measurement or test results. Spell out both terms in the RFQ so the supplier cannot confuse them.

Does every terminal block order need a FAT?

No. Catalogue components normally need a controlled sample, first-article inspection or incoming inspection. A FAT is more appropriate for a custom assembled or prewired terminal row and only when the RFQ defines the configuration, test plan, acceptance criteria, witness points and report requirements.

How should alternates and product changes be controlled?

Require every alternate to be identified in writing with an exact part number, technical comparison and supporting evidence. No substitute should be treated as approved by silence. The RFQ should also define PCN and PDN scope, notice timing, affected-lot identification, requalification and last-time-buy requirements.

Official and primary references

Check current records again before release

Standards and legislation are controlled sources. This article paraphrases public boundaries and does not reproduce copyrighted requirements or replace the active project documents.

UL 1059 — Terminal BlocksActive product-standard record; verify exact model status, certification scope and end-product conditions.Open UL record
UL Product iQOfficial certification database context for status, categories, files and Conditions of Acceptability.Open Product iQ information
UL Component RecognitionExplains the use of Recognized Components under defined end-product conditions.Open UL guidance
UL 1953 — Outline of Investigation for Power Distribution BlocksSeparate UL component-evaluation route for power distribution blocks; do not merge it with UL 1059.Open UL record
UL SCCR machinery guidancePublic source for Supplement SB default and conditional short-circuit boundaries.Open UL guidance
IEC 60947-7-1:2025Terminal blocks and test-disconnect terminal blocks for copper conductors within the stated scope.Open IEC record
IEC 60947-7-2:2009Protective-conductor terminal blocks for copper conductors.Open IEC record
IEC 60947-7-3:2009Safety requirements for fuse terminal blocks within its stated scope.Open IEC record
IEC 60664-1:2020+A1:2025Insulation-coordination framework for voltage, overvoltage category, pollution, altitude and related inputs.Open IEC record
European Commission — CE markingManufacturer responsibility and applicable EU conformity-assessment context.Open Commission guidance
European Commission — RoHSOfficial EU hazardous-substances legislation overview; applicability and product scope must be checked.Open RoHS overview
ECHA — Candidate List substances in articlesOfficial REACH supply-chain communication context for applicable articles.Open ECHA guidance
ICC — Incoterms 2020Official context for selecting the rule, version and precise named place.Open ICC resource
OSHA 29 CFR 1910.333U.S. workplace deenergization, lockout/tagout and qualified-person verification boundary.Open OSHA standard
Turn the BOM into a comparable quotation

Send the circuit, terminal plan, evidence needs and commercial basis together

Share the BOM, destination markets, conductor schedule, circuit and fault context, accessories, labels, quantities, documentation list, packaging and delivery target. SENTOP can review matching series, accessory completeness, document availability, MOQ, pack and lead-time assumptions while returning every exception for your approval.