Exact component
Record OEM name, full catalog number, suffix, revision or date code when used, color, level count, link type and production site when it is a controlled field.
Approve the exact part, installed assembly and evidence package. A sample that looks right does not qualify another suffix, accessory set, approval condition, production site or future lot.
Approve a sample only when the exact part, revision, accessory set, installation layout, conductor use and technical file match the controlled OEM design. The sample must fit the real rail or PCB. It must support the stated wire and work method. Its marks, packing and market evidence must also match the release file.
A visual pass is not enough. A passed unit does not prove that each future lot is the same. It does not qualify another catalog suffix, mold, plant, material, coating, tool or document revision.
Treat the sample as one part of a release system. Link it to a signed baseline, supplier change rules and incoming checks.
Purchasing, design, quality and service must all be able to identify the same released item.
Record OEM name, full catalog number, suffix, revision or date code when used, color, level count, link type and production site when it is a controlled field.
State feed-through, PE, fuse, test, disconnect, shield, multi-level, high-current, plug or PCB duty. A similar shell can hide a different role.
Freeze the rail or footprint, terminal order, end parts, bridges, covers, markers, duct relation and the wire family used at each point.
Archive the live data sheet, size drawing, instructions, approval record, declaration and accessory catalog. Record the issue date or revision.
Link the unit, pack label, lot or date mark, supplier, order and photos. Define which fields receiving staff must see on a later shipment.
List target nations, product class, customer rules and any Ex or other special use. Ask for proof that covers the exact item and use.
Some OEMs use APQP or PPAP terms. Others use a first-article, sample release or supplier qualification file. Use the customer and quality-system language that applies. The evidence can be mapped across systems, but the names are not universal.
Show each molded mark and printed tag. Include the pack label and any lot, date or plant code. Use enough views to record the clamp, rail foot, wire entry, levels, side wall and accessory ports.
Then build the real local stack. Show end clamps, end plates, dividers, bridges, test or fuse parts and markers. Include nearby duct, covers and the box door. A loose unit can pass while the row fails.
Store the files with the BOM and drawing revision. The terminal block specification guide gives a stable order for reading each data row.

Data-sheet dimensions are the start of the fit check, not the end.
Check the DIN rail or PCB fit, latch, direction, end restraint and row alignment. Use only the build shown in the item data.
Check pitch, width, height, depth, markers, covers, duct, door and spare rail space. Record the complete row length.
Use the real wire, end prep and bend path. Check entry angle, strip work, tool reach and view of the terminal ID.
Fit each bridge, plate, cover, fuse, test part, plug, code and marker. Confirm the exact family and pole count.
Check gaps, surface paths, solid parts, PE groups and each safety or Ex boundary in the built row.
Use the stated strip length, torque or tool. Check that a trained worker can make and inspect the joint with no harm nearby.
Check marks, test points and all parts due for service. Do not approve a plan that needs unlisted tear-down.
For a PCB part, freeze pitch, pins, footprint, board build, solder or press process, mating half and wire side.

Match the wire metal, solid or strand form, flex class, AWG or mm², bare or ferruled end and wire count. Use the exact strip, crimp and insert method. A ferrule can change the top size accepted by the block.
Record AC or DC use. Keep normal voltage, Ui where stated and Uimp apart. Record the current row, bridge or feed limit, nearby load, heat and any derating. Do not blend the largest values from IEC, UL or another approval table.
Keep current, short-time proof, SCCR and break rating in separate fields. A part value may depend on an upstream fuse or breaker. It does not replace the full panel review. For a deeper path check, use the guide to current rating versus actual load.
Use current reports and certificates to support the exact product. Add OEM fit, function and project checks where needed. High-voltage, short-circuit, temperature-rise or other destructive work belongs in a defined plan with qualified staff, suitable equipment, stated criteria and safe lab controls. This article is not a field test method.
Archive the exact-model record, its scope and each condition used by the OEM review.
Match catalog number, file or ID, category, ratings, use group and Conditions of Acceptability when they apply.
IEC 60947-7-1 and UL 1059 address component scope. The finished panel, machine or PCB still needs its own review.
Get current, part-specific documents. Record date, scope and exemptions. Route substance issues to the OEM compliance owner.
Match the exact mark, certificate, approved parts, gaps and install terms. Do not infer scope from the base shell.
Freeze each controlled resin, metal, plating or flame class only to the degree required by the design and supply contract.
Set rules for document age and new revisions. A PDF kept for years may no longer match the item or current market file.
Name who checks design, quality, supply and compliance. Record open issues, limits and approval with restrictions.
Confirm spacing, wires, parts, protection, box and service terms in the real build. A component mark does not grant this result.
The evidence needed depends on the product, market, supply-chain role and current substance rules. Keep the exact item, declaration date and scope together. Do not copy a statement from a related family without a direct link to the supplied part.
List each bridge, feed-in, plate, divider, end clamp, cover, marker, plug, test part, fuse part and code key. State the exact part number and position. Do the same for PE and shield parts.
A bridge can set a lower current. A plate can be needed for touch or spacing. A revised pitch can make an old jumper wrong. A marker or cover can clash with duct or a service tool.
Keep the row plan and accessory BOM at one revision. Link them to a clear photo of the approved build. The terminal block accessories guide explains the roles of the main parts.

Sample count and test depth must follow risk, volume, contract, design age and supplier history. There is no universal number.
Check the exact part on paper. Review wire, rating, function, geometry, parts and market needs. List each gap.
Build the real local row or PCB set. Check access, marks, wire work, parts and the work instruction.
Run only the tests called for by the OEM plan. Link method, gear, unit ID, result and decision.
Sign the list. Freeze photos, data, proof, row plan and BOM. Keep a physical or digital golden reference.
Set packing, marks, lot trace, site, no-change rules and incoming checks before the bulk order.
Check later lots against the baseline. Hold any drift. Trigger review for each change named in the agreement.
A retained unit shows the state that was accepted. It does not by itself prove process capability or lot consistency. Its value comes from clear identity, a duty to report change and a repeat check that links later stock to the same baseline.
Add the project criteria and document IDs before the form is used.
| Approval item | Required evidence | Release result |
|---|---|---|
| Project identity | Program, customer, drawing and BOM revision, supplier, OEM, exact part, suffix, role, market and reviewer. | Scope is clear and all groups refer to one item. |
| Sample trace | Sample ID, lot or date mark, pack label, photos, plant or origin when required, and data revision. | The unit can be tied to its record and later receipts. |
| Mechanical fit | Rail or PCB fit, row order, size, duct and door gap, end restraint, tool access, marks and service view. | The full local build fits and can be made as planned. |
| Wire and joint | Metal, strand form, size, end prep, strip value, tool or torque and work instruction. | The real wire set can be made and checked. |
| Functional parts | Bridge, plate, divider, marker, fuse or test part, PE or shield part, cover, plug and code. | All parts and positions match the released row. |
| Technical use | Voltage row, current path, heat, insulation, fault-duty owner and any special environment. | Each use condition has stated proof and an owner. |
| Market evidence | Approval IDs, certificates, declarations, RoHS or REACH file, scope, date and each exception. | Exact-item evidence meets the target market plan. |
| Test record | Risk basis, quantity, method, unit ID, gear, criteria, result, fault and corrective action. | The work is traceable and the decision is clear. |
| Production control | Golden reference, marks, pack, lot trace, site, change notice, reapproval triggers and incoming plan. | Future supply is tied to the approved state. |
| Final decision | Approved, approved with a stated limit, or not approved; named design, quality, supply and compliance sign-off. | No vague or open-ended sample approval remains. |
A family-level pass can hide a changed suffix. A loose sample can hide a bad row. A valid part record can still be used outside its terms. A good handpicked unit can still come from a weak bulk process.
Hold the item when the mark, pack, site, material, process, tool, approval, document or part set drifts from the baseline. Route the gap through the change plan. Do not let supply pressure turn a deviation into silent approval.
Use a formal terminal block cross-reference review when a new sample is meant to replace a released model. Replacement adds a direct old-versus-new comparison.
Use these as scope rules. Add the exact project criteria before release.
Approve the exact cataloged item and its stated build context: function, link type, accessories, rail or PCB layout, wire use, marks, data, market proof, packing and change terms. A bare unit is not enough when the row depends on linked parts.
No. A component approval or standard reference is useful evidence. End-product fit still depends on the actual build, use conditions, equipment rules and market route. Keep the part proof and finish the OEM-level review.
There is no universal number. Set the count and test depth from safety risk, contract, volume, supplier history, design age, special approvals and any destructive work. Record why the chosen scope is enough.
Yes, when wire fit or the work process is in scope. Use the stated metal, strand form, size, end prep, ferrule or lug, tool and instruction. Product type-test proof remains separate.
Yes, when the design uses them. They can affect power links, group bounds, marks, service access and row size. Record each exact part and position in the approved BOM and sample build.
Request current, part-specific supplier documents. Keep the issue date and scope. Route each exemption or substance report to the OEM compliance owner. Do not copy a declaration from a related family.
Review a change that can affect identity, fit, electrical role, approval terms, material file, plant, tool, process, pack or marks. Put the triggers in the supplier agreement before bulk release.
It is a controlled reference for the accepted state. It may be a built strip, sealed unit or photo and document pack. It must link to exact parts, linked parts, files and the signed decision. It does not prove all later lots are the same.
Send the BOM, drawings, markets, wire data, rail or PCB layout, supplier files and planned production controls.
Product and project enquiry
Share the model, ratings, quantity and destination you already know. SENTOP will review the remaining selection details with you.
SENTOP Team
Typically replies within minutes
Do you want to learn more about our products or services?
Contact Us
🟢 Online | Privacy policy
Contact Us